FRANKLIN COUNTY LITTLE FARMS WATER MAIN REPLACEMENT

Project Description

Design Phase – Provided design, engineering cost estimates and bid plans for the construction of 30,600 linear feet (LF) of new water lines in the Little Farms neighborhood in southwest Franklin County, Ohio.  Design included pavement, curb, sidewalk and driveway replacement plans, maintenance of traffic (MOT), SWPP, and construction sequencing optimization to minimize traffic disruption.

Construction Phase – After completion of the design phase, CCI was awarded construction management for this project.  Worked on the design and development of engineering cost estimates and bid plans; currently managing construction administration and construction inspection (CA/CI)

Services provided included:

  • Field investigations
  • Hydraulic and Hydrological Analysis
  • Preliminary and Final Design Report
  • Alternatives Analysis and Engineering Cost Estimates
  • Right of Way and Easements
  • Stormwater Pollution Prevention Plans (SWPPP)
  • Maintenance of Traffic Plans (MOT)
  • Permitting
  • Draft and Final Construction Plans and Specifications
  • Bid Documents
  • Construction Administration
  • Construction Inspection
  • Change Order and RFI Management
  • Record Plans
Project Details
Category

Facilities, Projects, Utilities

Previous
Next