image
Welcome to CCI Engineering.
Feel free to ask any question.
admin | CCI Engineering Services
-1
archive,author,author-admin,author-1,eltd-cpt-2.2,ajax_fade,page_not_loaded,,moose child-child-ver-1.1,moose-ver-3.4, vertical_menu_with_scroll,smooth_scroll,side_menu_slide_with_content,width_370,blog_installed,wpb-js-composer js-comp-ver-6.7.0,vc_responsive

Author:admin

Preparing an organization to support a life cycle BIM approach is a complex activity that will fundamentally affect the manner in which the airport operates. A comprehensive CMM should be performed to assess the readiness of the organization to utilize BIM and to identify where...

The current standard for facility data handover after construction is a set of 2D record plans, equipment speci cations, O&M manuals, and possibly commissioning reports. Many airports have experienced, or will experience, BIM during design and construction because architects, engineers, and contractors have been adopting...