Archive

Developed the Stormwater Design Report and civil engineering design services for a new corporate hangar being constructed at the Ohio State University Airport. CCI provided design services for the site development including grading, stormwater detention basins, drainage systems parking lot and lighting, sidewalks, ramps, SWPPP, and...

CCI worked on the design of the Terminal Intermodal Terminal Facility, Automated People Mover, Passenger Drop Off Lobby, and also assisted with program management. We provided BIM services and coordination for Fire Protection systems through final construction. CCI was contracted to perform a BIM Operational Readiness Assessment...

CLEVELAND HOPKINS AIRPORT TAXIWAY Q & HOLD PAD

CCI provided existing condtions Capture for the 2.7M sf I-X Conference Center in Cleveland, OH. The facility was first built in 1944 and has undergone a number of transformation durings its history. At the time of this project no accurate or complete as-built...

CCI provided Revit BIM modeling and design services from construction through commission for electrical, plumbing, HVAC and mechanical, subcontractor coordination and final record drawings and model.  Structural and architecture revisions and construction sequencing also provided.  Completed summer of 2014 as sub to Sauer Engineering and...

CCI performed a study for the Airport Cooperative Research Program (ACRP) to create a guidebook for airports on how to utilize Building Information Modeling (BIM) during the Facilities Management portion of the Asset Life Cycle. Rather than approach BIM as a technology, the study...