Archive

Easterly Chemically Enhanced High Rate Treatment

Challenge: The Northeast Ohio Regional Sewer District (NEORD) is expanding capacity in order to avoid releases of untreated water into freshwater sources during severe storm events. The ECHERT was designed to be able to provide accelerated treatment capabilities to prevent such untreated discharges. Solution: CCI provided...

cci_projects_akron_headworks

Challenge: The existing Akron Headworks facility was built in 1954 and was no longer able to operate at designed peak flow during wet weather events resulting in release of untreated water into freshwater sources. In order to achieve the desired 280 MGD (millions of...

PROJECTS_CCI_DIVERGING_DIAMOND

Challenge: While Diverging Diamond Interchanges (DDI) reduce congestion and improve safety, their innovative design can be confusing when first encountered by the public. ODOT wished to develop tools to inform the public on the benefits of the new design and how to properly navigate...

The project consisted of improvements to the Cherry Street (SR 93) and Locust Street (CR 228) intersection.  Design work included widening and resurfacing 750 feet of Cherry Street (SR 93) and 700 feet of Locust Street (CR 228) for intersection geometric improvements, improved turn lane...

Design Phase – Provided design, engineering cost estimates and bid plans for the construction of 30,600 linear feet (LF) of new water lines in the Little Farms neighborhood in southwest Franklin County, Ohio.  Design included pavement, curb, sidewalk and driveway replacement plans, maintenance of traffic...

This LEED-certified 50,000 sq.ft. plant supplies the expanded and existing hospital complex.  CCI aided in developing a 3D BIM model of the facility for coordination, installation and cost analysis, adapted the conduit routes and electrical equipment locations as design changes occurred, and drafted the lighting...

CCI worked on developing the electrical BIM model on site for the 225,000 sq. ft, LEED Silver certified Chemical and Biomolecular Engineering and Chemistry (CBEC) building on OSU's campus in Columbus, Ohio. The design was completed in 2013.  Sub to The Superior Group....