Archive

CLEVELAND HOPKINS AIRPORT TAXIWAY Q & HOLD PAD

CCI provided existing condtions Capture for the 2.7M sf I-X Conference Center in Cleveland, OH. The facility was first built in 1944 and has undergone a number of transformation durings its history. At the time of this project no accurate or complete as-built...

CCI provided Revit BIM modeling and design services from construction through commission for electrical, plumbing, HVAC and mechanical, subcontractor coordination and final record drawings and model.  Structural and architecture revisions and construction sequencing also provided.  Completed summer of 2014 as sub to Sauer Engineering and...

CCI worked on developing the electrical BIM model on site for the 225,000 sq. ft, LEED Silver certified Chemical and Biomolecular Engineering and Chemistry (CBEC) building on OSU's campus in Columbus, Ohio. The design was completed in 2013.  Sub to The Superior Group....

CCI Engineering Services has just completed a two-year contract with the Port of Seattle to develop their BIM Standards and Processes. The Port of Seattle is comprised of three divisions: aviation, maritime, and economic development. CCI performed a comprehensive BIM Needs Assessment, interviewing...

CCI performed a study for the Airport Cooperative Research Program (ACRP) to create a guidebook for airports on how to utilize Building Information Modeling (BIM) during the Facilities Management portion of the Asset Life Cycle. Rather than approach BIM as a technology, the study...