Portsmouth Bypass (SR 823), Portsmouth Joint Venture Group. The project is a four-lane, divided, limited-access highway bypassing the City of Portsmouth in Scioto County, Ohio. This project is comprised of 16 miles of a new highway. CCI performed Storm Water Pollution Prevention Plans (SWPPP)...

Easterly Chemically Enhanced High Rate Treatment

Challenge: The Northeast Ohio Regional Sewer District (NEORD) is expanding capacity in order to avoid releases of untreated water into freshwater sources during severe storm events. The ECHERT was designed to be able to provide accelerated treatment capabilities to prevent such untreated discharges. Solution: CCI provided...

cci_projects_akron_headworks

Challenge: The existing Akron Headworks facility was built in 1954 and was no longer able to operate at designed peak flow during wet weather events resulting in release of untreated water into freshwater sources. In order to achieve the desired 280 MGD (millions of...

cci_projects_brookhaven-higsh-school

Challenge: Columbus City Schools was performing fire alarm upgrades at a number of public schools throughout the city and required updated floor plans for the planning and design of these upgrades. Solution: CCI developed updated floor plans by performing both internal and external laser scans of...

PROJECTS_CCI_DIVERGING_DIAMOND

Challenge: While Diverging Diamond Interchanges (DDI) reduce congestion and improve safety, their innovative design can be confusing when first encountered by the public. ODOT wished to develop tools to inform the public on the benefits of the new design and how to properly navigate...

HRBT-Expansion-Project-Corridor-Concept.

Challenge: Provide a tool to effectively communicate the upcoming changes to the I-64 corridor as VDOT launches its $3.8B plan to increase capacity of one of the most congested traffic corridors in the U.S. Solution: CCI developed a 3D model from the design plans and created...

CCi projects civil Engineering 1055 oak street

These projects consisted of multiple utility designs to serve new commercial properties in downtown Columbus. Complete Water Service Plans were developed for each project. In addition, relevant design phase aspects of this project include open-cut construction, new service connections for multiple utilities including City...

The first construction project from the Far East Freeway Study (PID# 76997) Phase 1 includes partially reconfiguring the system-to-system interchange of I-70 and I-270, and the system-to-service interchange of IR-70 and Brice Road by removing major weaving movements.  The reconfiguration will separate the through and...

cleveland-ODOR-opportunity

The project is a Design-Build contract to construct a four-lane, divided, boulevard highway passing through the City of Cleveland in Cuyahoga County, Ohio. CCI performed utility design for approximately 9000 feet of water main, which included distribution mains and a bridge-mounted 30” transmission main.  Work...

The project consisted of improvements to the Cherry Street (SR 93) and Locust Street (CR 228) intersection.  Design work included widening and resurfacing 750 feet of Cherry Street (SR 93) and 700 feet of Locust Street (CR 228) for intersection geometric improvements, improved turn lane...